The main clients of Elinco Construcciones Eléctricas S.L. are the main Spanish shipyards and many ships and platforms in many countries. We carry out all kinds of activities relating to electricity or systems automation. Some of our jobs have been:
For the Navantia Group:
Navantia Fene:
- Electrical installation on the ships Petrojarl IV and Texaco Captain
- Supply of illumination switchboards and power frames for the ships Petrojarl IV and Texaco Captain
- Supply of the Navigating Bridge control bracket, secondary illumination boards and secondary accommodation boards for the ships NC-275 (Discoverer Enterprise), NC-276 (Discoverer Spirit), NC-277 (Discoverer Deep Seas)
- Complete electrical installation for the accommodation modules, control of generators, UPS, communications, earth systems, navigational lights and Ethernet network of the ships NC-275, NC-276 and NC-277 of Transocean Offshore Inc.
- Mechanical Completion and Pre-commissioning ICS of the ships Texaco Captain, NC-275, NC-276 and NC-277 of Transocean Offshore Inc.
- Bay of 15Kv line connection and interconnection line from the head office of the old Astano to Imenosa
- Maintenance of the transformation centres in the factory, and its equipment and electrical machinery, too
- Electrical installation of the offshore device NC-279 (Farwah).
- Design and manufacture of the power supply panel for welding groups of the shipyard
- Supply and production of a test tank for generators
- Complete electrical installation for the ship Polar Enterprise
Navantia Ferrol:
- Installation and start-up of the communications system, fire detection and computer network on the ship Capitán Núñez

- Supply and production of control and rectification panels for wind turbines
- Supply and production of the navigating bridge bracket for the F100 series ships
- Supply and production of the earth connection boards and 400Hz for the F100 and F310 series ships
- Supply and production of several boards for the F100 and F310 series ships: secondary boards, retainer boards…
- Electrical installation of the F100 series ships for the Spanish navy
- Electrical installation of the F310 series ships for the Norwegian navy
- Electrical installation of strategic supply ship Juan Carlos I
- Execution of engineering jobs on the ship Juan Carlos I
- Creation of Protocols for Mechanical Tests
- Support for the Execution of Mechanical Tests
- Semaphore control panels
- A-LHD: Creation of Protocols for Mechanical Tests
- Repair of the ship NAVION SAGA
Navantia in Cadiz bay.- San Fernando and Puerto Real:
- Installation and tests of C/84 Navion Odin
- Complete electrical installation of the strategic supply combat-ship A-15, Cantabria
- Electrical installation of the ocean patrol and vigilance vessels 505, 507 and 508
Ghenova:
- Execution of single wire electricity and electronic systems for the ship F105
- Execution of route plans of electricity and electronics for the ship F105
- Execution of schemes of wired electricity for the ship F105
Astican:
- Electrical installation of the boards and superstructure of the freezer ship Pruzhany
- Electrical installation and installation of boards and control brackets for the machine room in the dredger Sea Lion.
Isolux:
- Electrical installation of the offshore ships BOA DEEP and BOA DEEP II
- Electrical installation in chemical product transportation ship C492
Factorías Vulcano S.A.:
- Supply and production of tests tanks for generators up to 4000 A
- Supervision, pre-commissioning, support and tests delivery for the classification society and owner of the ship C/478
Materiales del Atlántico:
- Maintenance of the installations in the cement factory in Narón
- Repair and maintenance of motors
Poligal:
- Repair and maintenance of motors
Hospital complex Arquitecto Marcide:
- Maintenance of installations in the hospital
- Maintenance of HV converters
Teconsa:
- Electrical installation in 72 homes